hak.com.pl
SITE MAP
Polska Wersja
Polska wersja
русская версия
русская версия
Support

Do you have any
questions or concerns?
Contact us.

Underslung overhead travelling cranes

Application: in tight spaces with difficult design conditions –low halls, crane track is installed directly on the factory ceiling  
single girder - capacity from 0,5t-up to 6,3t, span up to 17,5m
single girder – capacity up to 8,0t, span up to 9,0m.

Galery of projects

Send an inquiry form

Company Name:
Name: *
Adress:
Phone:*
E-mail: *
VAT number:
Message:
* required field

1. Underhung crane quotation questionnaire:
Capacity WLL = [kg]
Span L = [m] 
Working group*: A1, A2, A3, A4, A5, A6, A7, A8, A9 wg PN-91/M-06503
Lifting height = [m]

2. Working condition:


indoor outdoor mixed   other : 

3. Operation environment:

standard explosive conditions dustiness mixed other : 

4. Control:

cabin pendant remote   other : 
         Control voltage :  [V]

5. Required speeds:


two speeds stepless speed (fluent)     other : 

6. Speeds:


Lifting speed    [m/min]  
Trolley travelling speed    [m/min]  
Bridge travelling speed    [m/min]  

7. Crane power supply:


conductor rail pflat cables cable trolleys other :
          Power supply voltage [V]

8. Hoist power supply:


conductor rails flat cables other :

9. Crane installed with crane rails:



tak nie  
10. Number of cranes on track: capacity [t]:
capacity [t]:
capacity [t]:
capacity [t]:

Dimensions

Crane span suwnicy:            L =   [m]
Hall width hali:                   R =   [m]
Hall height hali:                    T =   [m]
Distance from the rail head to the floor  S =  [m]
Height of the trestle bridge:           W =  [m]
Lifting height: Hmax =  [m]
Distance from the hook to the rail axis:a1 =  [m]
Distance from the hook to the rail axis:a2 =  [m]

* - If you do not know crane working group please fill in the questionnaire…
below to help us choose the right group :

1. Crane working time – number of shifts

Number of shifts
I II III

2. Number of operating cycles per shift

Number of cycles

3. Load on crane during operation

Load spectrum nr 1 nr 2 nr 3
Service,
hours per day
of operation [h]



Crane load
in tones [t]





 

Check similar products

Single gilder overhead
travelling cranes

Double girder overhead
travelling cranes

Underslung overhead
travelling cranes